Prequalification / June 2026

Confidence,
built on evidence.

Structured management systems, documented controls, authority approvals and project records prepared for client, consultant and main-contractor evaluation.

Industrial facility representing controlled HSE project environments
IMSQuality · Environment · OH&S
Quality · HSE · Authority · Documentation
Management systems

Recognised standards.
Applied controls.

The prequalification appendix retains certificates and related management-system evidence for the three core ISO frameworks.

These systems support the way Hariwar plans quality, environmental responsibility, occupational health and safety, internal audits and corrective action.

ISO 9001Quality management
ISO 14001Environmental management
ISO 45001Occupational health & safety
HSE & quality

Planned, checked and closed out.

Safety and quality are treated as active site disciplines supported by records—not end-of-project paperwork.

HSE / Zero-accident mindset

Safe work begins before mobilisation.

Project HSE planning, risk assessment, training, supervision, worker participation, environmental controls, monitoring, corrective action and project-specific compliance support.

Risk assessmentTrainingSupervisionEnvironmentCorrective action
Hariwar site engineers wearing branded personal protective equipment
QA / QC

Inspection readiness by design.

Quality planning, material and work inspections, test records, comment closure, as-built information and close-out documents aligned to project requirements.

Testing & handover

A clear evidence trail from installation to acceptance.

Pre-testing, rectification, commissioning reports, authority inspection support and handover records are coordinated as part of the delivery sequence.

ITPsTest recordsCommissioningAs-builtsClose-out
Supporting documents

A structured evidence index.

Hariwar’s prequalification appendices preserve official policies, certificates, approvals and third-party records. Current copies are issued for the relevant tender or registration context.

01

HSE systems

Health and safety policy, environmental policy, HSE procedures and supporting records.

02

QA / QC systems

Quality assurance and quality control policy, procedures, records and process references.

03

Certifications

ISO 9001, ISO 14001 and ISO 45001 certificates with related management-system evidence.

04

Commercial & authority records

Commercial licence, chamber documents, TAQA electrical contracting approval and Abu Dhabi Municipality classification.

05

Resources

Machinery, test equipment, project team and broader resource records.

06

Experience

Previous approvals, the 37-project register and client / consultant records.

07

Organization

Organization chart and ADQCC personnel approval records.

Authority position

Verified for the work.

The June 2026 pack contains current Abu Dhabi authority evidence for electrical contracting and engineering activities.

TAQA Distribution accepted Hariwar for Category First electrical contracting, with the supplied certificate valid to 15 May 2027. The Abu Dhabi Municipality classification records building-contracting and electrical-services activities, with the supplied classification valid to 12 April 2027.

Approval scopes, validity and project-specific conditions should always be confirmed against the current official document before award.

Need an evaluation-ready submission?

Request prequalification